–United Nations – UNMAS Irq (United Nations Mine Action Service )
Underwater demining, removing improvised explosive devices and other explosive devices from the last War while destroying the steel bridge at the river Euphrates in Fallujah, Iraq.
– Lustica Bay (Lustica Development and Ingemar Italy)
Installation of pontoon, anchoring and mooring system
– Dream Yacht Croatia
Anchoring system installation for Port Morinj
– Lustica Bay (Lustica Development i BB Solar)
Cable and concrete blocks installation for lightning protection
–Bar city and AD Jedinstvo Sevojno
Sanitation and repair of underwater sanitary system in Sutomore, replacement of gabions and weight controller and underwater concreting
– Montenegrin Electricity company and Hiperion doo
Sanitation of Krupac dam outlet, control gate installation, underwater drilling
– Luštica Marinas Development, Radovići
Sea bed drilling and blasting in purpose of providing enough depth for installation of Key Wall and enough depth for boats on location of Luštica Bay Main Marina. Underwater drilling and blasting with explosive surface of more than 5000 square meters and 4000 drilled holes for mines.
– Celtikcoglu (Turkey)
underwater outflow Meljine, installation and positioning of underwater sewage outflow pipe radius ᴓ1000 total length 1200m with diffusor. Installation of weights and gabions weight 2t -10t on all length of pipe on depths 2m – 45m
– Azmont investment (Azerbejdžan-Crna Gora), PortoNovi
Metal detection and terrain search for unexploded ordinances up to depth of 6m on location for future touristic complex PORTONOVI. Terrain search for UXO, metal detection, removal of UXO on total surface 244.666m2.
– Port of Kotor, Kotor
Installation and positioning of flotation pontoons and anchoring blocks for pontoons. Connecting blocks and pontoons, and leveling pontoons.
TOSHIBA T & D, DEMINING
August 2014.
Overgrowth removal and search of suspected areas for unexploded ordnance (uxo) on the access road and the canal for the construction area designated for the Lastva – kotorsko converter station connector hvdc 1,000 mw ± 500 kvdc electrical network “Italy – Montenegro”.
scope of work: 19 655 m²
investor: TERNA SPA
TOSHIBA T & D, DEMINING
July 2014.
Overgrowth removal and search of suspected areas for unexploded ordnance (uxo) on the access road and the canal for the construction area designated for the lastva – kotorsko converter station connector hvdc 1,000 mw ± 500 kvdc electrical network “Italy – Montenegro”
scope of work: 87.570 m²
investor: terna spa
– Regionalni vodovod Crnogorsko primorje, Budva ( Regional water supply )
Cleaning of water spring Boljesestre, maintenance works on spring basin and pump station inlets. Removal of vegetation, sand and other materials from spring basin.
– Regionalni vodovod Crnogorsko primorje, Budva ( Regional water supply )
Installation of buoys with warning tables with counter weights system at the underwater part of regional water line, on location Skadar lake, for water supply of Montenegrin coast